Back
Exit My Solar Deal

My solar panels were installed but never turned on — what now?

Short answer

Your system is stuck before permission to operate (PTO) — the utility’s approval to switch it on and connect it to the grid — and until that happens it produces nothing, while loan or lease clocks may already be running. Who owes what in that gap is written in your contract’s installation and completion terms: when payments were supposed to start, what the installer still owed you, and what was supposed to happen before anyone got paid in full. Start by documenting the state of the system exactly as it sits, in writing, to every company involved.

What PTO is, and who grants it

Permission to operate comes from your electric utility, after the installation passes inspection and the interconnection paperwork is filed — usually by the installer. Until PTO is granted and the system is energized, the panels on your roof are equipment, not a power plant: no production, no bill offset, no credits.

What your contract says about the gap

Read the installation and completion sections for three things: when your payments were supposed to start, what counted as the job being finished, and whether the installer owed you anything for delay. Some states wrote the protection into law — Arizona’s solar statute, for example, provides that recurring lease payments may not begin until permission to operate has been granted and the system is energized. Where no statute says it, your contract’s own terms are the measure.

Document, then write

Photograph the system as it sits — panels, inverter, any unfinished work — with dates. Call the utility and ask a checkable question: does an interconnection application exist for your address, and what is its status? Then put the position in writing to the installer and to the lender or servicer: installed on this date, never energized, payments running since this date. Whether to keep paying in the meantime is the stop-paying question — read that guide before deciding anything, because the default trap is real even when the system is dead.

If the installer has vanished

A half-finished, never-energized system is the stranded-install pattern the bankruptcy guide covers: the installer may be gone, but the lender is not, and finance partners have been allowed to step in to finish stranded installations in at least one major case (Freedom Forever, 2026). The lender or servicer is the contact; your documentation is the leverage.

Documents to gather

Questions to ask a licensed attorney

We are not a law firm, and this page is general information, not legal advice. These are the questions your paperwork raises that a licensed attorney in your state can answer for your situation:

  • My contract started payments before the system ever produced — is that enforceable?
  • The installer is gone and the system was never energized — what is the lender’s responsibility?
  • The utility says no interconnection application was ever filed — what does that do to my position?

Questions people also ask

Can they charge me for a system that makes no power?

It depends on the contract’s payment-start terms — which is why those pages come first. A production guarantee, if your deal has one, is a separate promise with its own terms.

How long should PTO take?

It varies by utility and by inspection, and no honest single number exists. The checkable fact is whether the application was ever filed — the utility can confirm that.

Should I stop paying until it is turned on?

Not on your own — stopping payment starts a default whether or not the system runs. Read the stop-paying guide, and put the position in writing first.

How the workbooks help

Your Actions documents the system’s state as it sits and the payments taken against it — and The In-Depth Version writes the whole record up, in order, for the lender, the servicer, or a complaint.

One package — both books always included. Each book is delivered by email within 3–5 business days of purchase; delivery occurs after the 3-business-day cancellation window closes.

Read a sample workbook (PDF) More homeowner questions

Related guides

Sources — checked against

This page was checked against the primary sources below. If a source and this page ever disagree, the source controls — and your own paperwork controls your case.

Sources last checked November 17, 2026 · Page reviewed by Exit My Solar Deal — Jeremy Williams and Dakota Sanchez, owners. General information only — not legal advice.